H3Gear

Keep gear assignment-ready before the crew leaves.

Every asset in your fleet — tracked, inspected, and tied to the project that needs it. Inspection status surfaces on the board before dispatch.

57 assets3 inspections dueGear list readyAsset history
57 assets trackedInspection due flaggedDeployment history

What changes when H3Gear is live

From spreadsheet inventory + paper inspection logs to live asset register tied to projects, inspections, and audit evidence.

The old way
  • Spreadsheet inventory tracking
  • Paper inspection logs and binders
  • No link between gear and project assignments
  • Manual audit evidence gathering
The H3ight way
  • Digital asset register with full lifecycle
  • Inspection status visible before assignment
  • Gear lists tied to projects on the board
  • Audit evidence auto-attached to records

How it works

Three workflows that change your daily operation.

Check inspection status before assignment
Inspection duePass/Fail statusPhoto evidence

Check inspection status before assignment

See which assets are overdue, due soon, or clear before adding them to a project gear list. Inspections with photo evidence and severity levels.

Build a project gear list
Kit assignmentProject linkTransfer history

Build a project gear list

Assign gear to projects so the board knows what equipment is going where. Kits deploy as a unit — check-out, check-in, and transfers tracked.

Recording ready
Audit bundleEvidence trailCompliance feed

Preserve inspection evidence for audit

Every inspection result, photo, and finding feeds into audit-ready records. When the auditor asks, the evidence is already organized.

H3ightboard

How H3Gear shows up on H3ightboard

Gear signals surface on the board so you catch inspection gaps and missing gear lists before dispatch — not after the crew arrives on site.

H3GearBoard signals
Live
57 assets3 inspections dueGear list readyAsset history

These signals surface on every project column in H3ightboard, so nothing gets dispatched without visibility.

H3ightboard — staffing board with project columns and signals

Stop guessing which gear is inspection-ready.

See how the H3Gear capability pack feeds your H3ightboard. Book a walkthrough.

Now accepting founding members